2020 – Replaced water heater
2019 – Replaced washing machine
2018 – Replaced refrigerator
2016 – Solar panels installed
2015 – Remodeled kitchen: all walls were stripped and completely rebuilt and re-finished. Drop-ceiling removed and replaced with a real ceiling. Bamboo flooring installed. Heater and stove moved to create more space for the countertop. Cabinets replaced and new countertop installed
– Remodeled upstairs bathroom: Removed broken floor-tiles and the floor was redone with new tiles placed. Replaced with a new, claw-foot bathtub and new shower.
2011 – New roof (with a 20 year warranty)
2008 – Fenced yard, and new double-steel coated chimney and wood stove installed
2007 – Created patio and built arbor, installed in double French doors connecting entrance hall to the living room, and installed in glass-pane door connecting staircase and upstairs hallway